°ÇÃ൵½Ã°ø°£¿¬±¸¼Ò

Architecture & Urban Research Institute

pdf¿ø¹®º¸±â ¿¡·¯ ÇØ°á¹æ¹ý ¹Ù·Î°¡±â



¹®ÇåȨ > ¿¬±¸³í¹® > »ó¼¼

[¿ø¹®º¸±â½Ã ¼ÒºñµÇ´Â Æ÷ÀÎÆ® : 100 Æ÷ÀÎÆ®] ¹Ì¸®º¸±â Àοë

´ëÇѰÇÃàÇÐȸ|ARCHITECTURAL RESEARCH(³í¹®Áý) 2012³â 9¿ù

³í¹®¸í Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project
ÀúÀÚ¸í Seok Heon Yun ; Sang Chul Kim
¹ßÇà»ç ARCHITECTURAL INSTITUTE OF KOREA(´ëÇѰÇÃàÇÐȸ)
¼ö·Ï»çÇ× ARCHITECTURAL RESEARCH(´ëÇѰÇÃàÇÐȸ ³í¹®Áý), v.14 n.3 (2012-09)
ÆäÀÌÁö ½ÃÀÛÆäÀÌÁö(109) ÃÑÆäÀÌÁö(8)
ISSN 12296163
ÁÖÁ¦ºÐ·ù ½Ã°ø(Àû»ê)
ÁÖÁ¦¾î Form ; Structural Work ; Guide-rail System ; Auto-climbing System ; Simulation
¿ä¾à2 In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS¡¯s cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.
¼ÒÀåó ´ëÇѰÇÃàÇÐȸ
¾ð¾î ¿µ¾î