| ³í¹®¸í |
SMART ÇÁ·¹ÀÓÀÇ °ø±â´ÜÃà È¿°ú ºÐ¼® - ´ëÇü ¹°·ùâ°í »ç·Ê - / Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings |
| ÀúÀÚ¸í |
±èµµ¿µ(Kim, Doyeong) ; Áö¿ì¹Î(Ji, Woomin) ; ÀÓÁö¿µ(Lim, Jeeyoung) |
| ¼ö·Ï»çÇ× |
Çѱ¹°ÇÃà½Ã°øÇÐȸ ³í¹®Áý, Vol.22 No.5 (2022-10) |
| ÆäÀÌÁö |
½ÃÀÛÆäÀÌÁö(519) ÃÑÆäÀÌÁö(12) |
| ÁÖÁ¦¾î |
ÈÞ¸Õ¿¡·¯; Á¶Á÷°ü¸®; »ç°í; m-SHEL ¸ðµ¨ ; human error; organization management; accident; m-SHEL model |
| ¿ä¾à1 |
ÀÎÅÍ³Ý »ó°Å·¡°¡ Áõ°¡ÇÔ¿¡ µû¶ó Àü¼¼°èÀûÀ¸·Î ´ëÇü ¹°·ù °Ç¹°ÀÇ °Ç¼³ÀÌ Áõ°¡Çϰí ÀÖ´Ù. ÀÌµé °ÇÃ๰Àº ´ëºÎºÐ Àå°æ°£ÁßÀçÇÏÀÇ Æ¯¼ºÀ» °¡Áö°í ÀÖÀ¸¸ç ºü¸¥ ½Ã°øÀ» À§ÇØ ÇÉÁ¶ÀÎÆ® ±¸Á¶ÀÎ PC °ø¹ýÀ» Àû¿ëÇÑ´Ù. ±×·¯³ª ÇÉÁ¶ÀÎÆ® ±¸Á¶´Â ½Ã°ø ¾ÈÀü¼º¹× ±¸Á¶Àû ¾ÈÁ¤¼ºÀ¸·Î ÀÎÇØ PC ºÎÀçÀÇ ¼³Ä¡¿¡ ¸¹Àº Á¦¾àÀÌ ÀÖ¾î ½Ã°£°ú ºñ¿ëÀÌ ¸¹ÀÌ ¼Ò¿äµÈ´Ù. ÀÌ·¯ÇÑ Á¦¾à°ú ¹®Á¦Á¡À» ÇØ°áÇϱâ À§ÇØ PC ºÎÀç »çÀÌÀÇ Ã¶°ñ Á¶ÀÎÆ®·Î ¿¬°áµÈ ±¸Á¶ ÇÁ·¹ÀÓÀÎ SMART frameÀÌ °³¹ßµÇ¾ú´Ù. SMART frame¿¡ ´ëÇÑ ¸¹Àº¿¬±¸°¡ ÁøÇàµÇ¾úÀ¸³ª °ø±â Ãø¸é¿¡ ´ëÇÑ ¿µÇâÀº ºÐ¼®µÇÁö ¾Ê¾Ò´Ù. º» ¿¬±¸ÀÇ ¸ñÀûÀº Àå°æ°£ ÁßÀçÇÏ ¹°·ùâ°í½Ã¼³¿¡ ´ëÇÑSMART frameÀÇ °ø±â´ÜÃà È¿°ú¸¦ ºÐ¼®ÇÏ´Â °ÍÀÌ´Ù. º» ¿¬±¸¸¦ À§ÇØ ±âÁ¸ PC °ø¹ý¿¡ ÀÇÇØ °Ç¼³µÈ »ç·ÊÇöÀåÀ» ¼±Á¤ÇÏ¿©SMART frame ¼³Ä¡ ½Ã¹Ä·¹À̼ǰú ½Ã°£ ´ÜÃàÀ» ºñ±³ÇÏ¿´´Ù. ±× °á°ú, ±âÁ¸ PC¼³Ä¡°ø±âÀÇ ¾à 48%ÀÇ ¼öÁØÀ¸·Î ¾à 4°³¿ùÀÌ ´ÜÃà µÇ¾ú´Ù. ÃßÈÄ ´ëÇü¹°·ù¼¾ÅÍ ÇÁ·ÎÁ§Æ® ÁøÇà ½Ã SMART frameÀ» Àû¿ëÇÑ´Ù¸é ±âÁ¸ PC°ø¹ý ´ëºñ ȹ±âÀûÀÎ °ø±â´ÜÃàÀÇ È¿°ú¸¦ °¡Áú °ÍÀ¸·Î ±â´ëµÈ´Ù. |
| ¿ä¾à2 |
As online commerce increases, the construction of large logistics buildings worldwide is exploding. Most of these buildings have the characteristics of long span and heavy loaded and use precast concretecomponents, a pin joint structure, for rapid construction. However, due to construction safety andstructural stability requirements, the pin joint structure has many limitations in terms of the erectionof the PC member, which increases the time and cost. A structural frame connected with steel jointsbetween precast concrete components, called a SMART frame, has been developed, which addressesthese constraints and risks. However, the effect of the appllication of a SMART frame on the time aspecthas not been analysed. The study is a time reduction effect analysis of a SMART frame for long span andheavy loaded logistics buildings. For this study, the authors select a case site erected using existing PCcomponents, and compare the time reduction with the SMART frame erection simulations. Throughthis analysis, it was found that a time reduciton about 4 months, approximately 48% of the conventionalPC installation period could be achieved. If the SMART frame is applied when carrying outfuture large-scale logistics building projects, it can be expected to have the effect of significantlyshortening the construction period compared to the conventional method. |